THE Floating Bridge is back in service after a three-hour delay this afternoon (Saturday).

A replacement launch service was operating for floating bridge foot passengers since noon, following the need to change the south west prow cable.

Problems with the vessel's prows have previously been at the centre of the vessel's withdrawal from service.

The boat has racked up a significant period of absence for more than a year.